For contractors building in Germany

The Last Planner System for data centres and mission-critical projects

Data centres, pharma plants and fabs are dense with M&E and built towards fixed dates. PLACE sets up the Last Planner System with your team and facilitates it on site in Germany, in German and English.

Reference
16 MW data centre, FrankfurtLast Planner System in execution
Also
Semiconductor fab, pharma plantand a research facility
Languages
German and Englishin the meeting and on the board

Why these sites need weekly commitments

Dense M&EMany specialist trades work in the same rooms at the same time. One late handover holds up the next three.
Fixed milestonesPower-on, testing and handover are set early. The plan has to be built backwards from them.
International teamsThe contractor works in English, many subcontractors in German. Both need the same plan on the wall.

Scope

What we set up with your team

PLACE is a neutral facilitator and not a party to the project. Programme, reporting and responsibility for dates stay with your team.

The result: milestones everyone can see, dependencies that surface weeks ahead, and trades that plan together.

  • Overall process analysisAll parties map the process and build the milestone and phase plan.
  • Weekly lean meeting systemRules, roles and a fixed agenda, with subcontractors from the start.
  • LookaheadSix weeks ahead, so that constraints are cleared before they block the work.
  • Train the trainerYour package managers learn to prepare and facilitate their part.

Deliverables

What your team receives

Sheet 01Weekly lean rhythmWho does what, and by when, in the week around the lean meeting.
Sheet 02The 90 minute lean meetingThe agenda that turns the plan into commitments.
Sheet 03Subcontractor preparationWhat prepared means for the meeting, and who to send.
Sheet 04Weekly lean reportPlan reliability, reasons for variance, constraints and milestones.

We facilitate every week and stay with the team through to the last milestone.

Proof

Mission-critical projects we have supported

Frankfurt · data centre

16 MW data centre

Milestones visible to everyone in the room, and trades that plan together.

Last Planner System in execution, for an international M&E contractor.

Client and project not named

Aerial view of the semiconductor fab in Villach, Austria, under construction Villach, Austria · fab

Semiconductor fab

Cleanroom precision at industrial pace, in one coordinated sequence.

Lean in design and construction for a 60,000 m² hall, from tender to execution.

Case study (in German)
Aerial view of a pharma production site Germany · pharma

Pharma production facility

A complex pharma project that completed its design phase swiftly.

Short lean meetings between client and designers, facilitated by PLACE.

Case study (in German)
Aerial view of the construction site of the FAIR particle accelerator in Darmstadt Darmstadt · research

FAIR particle accelerator

Several trades on the heating and cooling systems, coordinated every week.

Last Planner System with the M&E contractor and its subcontractors, on site.

Case study (in German)

In our clients' words

What the people on the project say

‘Through PLACE we have someone who brings us all together. That means we can work together collaboratively.’
Ayhan Karamik, Project Manager Scheduling and Lean Management, Rud. Otto Meyer Technik (translated from German)

More

Consulting and knowledge

How we work on any project in German-speaking countries, and the methods behind it.

Planning a data centre or plant in Germany?

Tell us the milestones you have to hit and where the trades stand today. We usually reply within one working day.